Operations
Overview
Port Facilities
Pier 10 Royal Caribbean International / BMW VPC
The terminal has a total area of 100,000 square feet as well as a state-of-the art passenger loading bridge.
BMW / WWL Vehicle processing center
Pier 16 Cruise Terminal
Cruise terminal 16 is currently under construction, expected to be completed by the end of 2025.
Pier 25 Carnival Cruise Lines
The terminal has a total area of 152,000 square feet, state-of-the-art loading bridge, a 550-square-foot VIP check-in and waiting room, and two 400-square-foot wedding rooms.
Pier 28 Disney Cruise Lines, Carnival Cruise Lines
The terminal has a total area of 160,000 square feet and two state-of-the art passenger loading bridges.
Pier 30/32 General Cargo
Imports wind power-related cargo such as windmill blades and tower sections as well as various project cargo.
Pier 35 CHS
Imports fertilizer. Two shipside gantry cranes serving the berth. Storage facilities have storage capacity of 70,000 tons. The berth is served by railway wagons.
Pier 39/40 Operators – Wallenius Wilhelmsen Ocean, K-Line, ARRC
Cargos Handled – Import / export of agricultural and construction machinery and vehicles, passenger vehicles, breakbulk
Vessel Services
Potable Water – Available upon request 24/7 with fittings and hoses provided. See Tariffs for rates.
Garbage – Garbage, slops and waste collection is coordinated with the ship agent and must be an approved APHIS reception facility
Bunkering – Bunkers can be supplied by truck or barge, please send bunker receipts/BDN to Email